The slideshow below shows some of the school and toilet build to date. Considerable work still needs to be done including a further classroom to be built, a perimeter wall as well as a bore hole for access to safe, clean drinking water and improved sanitation.
prev
next
play
-
Blocks All blocks are made by hand, left in the sun to cure & watered daily for 5 days before they're used
-
-
-
Foundations All hand dug with a shovel
-
-
-
Walls Knocking down walls to make the existing classroom and office one big classroom
-
-
-
-
One of the MANY deliveries
-
-
-
-
-
-
Windows
-
Roof The roof begins
-
-
-
-
-
The timber work for the start of the roof
-
-
-
-
-
The original veranda joints with the shuttering to do the beam work
-
Our new veranda joints
-
-
-
-
-
-
Extension 1 One of the new classrooms which we need
-
-
Toilets All the work below ground is dug by hand
-
-
-
-
-
-
-
-
-
-
-
-
-
Interior walls plastered
-