The slideshow below shows some of the school and toilet build to date.  Considerable work still needs to be done including a further classroom to be built, a perimeter wall as well as a bore hole for access to safe, clean drinking water and improved sanitation. 

  • All blocks are made by hand, left in the sun to cure & watered daily for 5 days before they're used
    Blocks All blocks are made by hand, left in the sun to cure & watered daily for 5 days before they're used
  • All hand dug with a shovel
    Foundations All hand dug with a shovel
  • Knocking down walls to make the existing classroom and office one big classroom
    Walls Knocking down walls to make the existing classroom and office one big classroom
  • One of the MANY deliveries
    One of the MANY deliveries
  • Windows
  • The roof begins
    Roof The roof begins
  • The timber work for the start of the roof
    The timber work for the start of the roof
  • The original veranda joints with the shuttering to do the beam work
    The original veranda joints with the shuttering to do the beam work
  • Our new veranda joints
    Our new veranda joints
  • One of the new classrooms which we need
    Extension 1 One of the new classrooms which we need
  • All the work below ground is dug by hand
    Toilets All the work below ground is dug by hand
  • Interior walls plastered
    Interior walls plastered